Module 1

Introduction and Rationale

Rationale, institutional objectives, and project control workflow for the NIA Training-Workshop on PERT-CPM and S-Curve.

Module 2

CPM Fundamentals and Critical Path Scheduling

Network logic, activity sequencing, forward pass, backward pass, float analysis, and critical path control for construction management.

Module 3

PERT Probabilistic Analysis

Understand how to incorporate time uncertainty into project schedules using three-point estimating, variance, and probability analysis to support risk-informed management decisions in irrigation projects.

Module 4

S-Curve Monitoring and Project Control

Construction of planned and actual S-Curves, banana curve interpretation, progress monitoring, variance analysis, and reporting for irrigation and infrastructure projects.

Module 5

AI Integration and Culminating Workshop

AI-assisted integration of CPM, PERT, and S-Curve outputs for schedule validation, progress assessment, reporting, and corrective action planning.

Module 6

Guided Workshop Activities and Integrated Project Output

Facilitator-ready two-day activity module for centralized data gathering, CPM-PERT analysis, S-Curve monitoring, reporting, graphing, and responsible AI-assisted review.