Training course
CPM, PERT and S-Curves
Plan activity networks, analyze schedule uncertainty, and interpret S-curves through worked project-control exercises.
- 6 modules
- 6 worked-example sets
- 5 topic quizzes
Course modules Follow the sequence or revisit a module
Introduction and Rationale
Rationale, institutional objectives, and project control workflow for the NIA Training-Workshop on PERT-CPM and S-Curve.
CPM Fundamentals and Critical Path Scheduling
Network logic, activity sequencing, forward pass, backward pass, float analysis, and critical path control for construction management.
PERT Probabilistic Analysis
Understand how to incorporate time uncertainty into project schedules using three-point estimating, variance, and probability analysis to support risk-informed management decisions in irrigation projects.
S-Curve Monitoring and Project Control
Construction of planned and actual S-Curves, banana curve interpretation, progress monitoring, variance analysis, and reporting for irrigation and infrastructure projects.
AI Integration and Culminating Workshop
AI-assisted integration of CPM, PERT, and S-Curve outputs for schedule validation, progress assessment, reporting, and corrective action planning.
Guided Workshop Activities and Integrated Project Output
Facilitator-ready two-day activity module for centralized data gathering, CPM-PERT analysis, S-Curve monitoring, reporting, graphing, and responsible AI-assisted review.