Module 16 Visual Coverage Map

Governing subject visual profile: .agents/visual-profiles/trainings/construction-plan-drafting-and-coordination.md (owned by PR #4527). This profile governs discipline, plan/section/isometric usage, Philippine construction-document context, accessibility, semantic color redundancy, SI-unit expectations, physical plausibility, review boundaries, and cognitive load for this training subject.

Secondary/reference precedent only: .agents/visual-profiles/civil/engineering-drawing-and-plans.md is used only as a precedent for the already-registered engineering-drawing visualizers reused in this module. It does not govern this training subject. Every reused interactive below was rechecked against the canonical training profile.

AssetObjective / learning questionConceptMedium / whyTechnical basisNonredundancy / accessibilityStatus
Plumbing Documentation StackUnderstand how authorized plumbing design information is translated into legends, plans, vertical diagrams, details, schedules, and external interfaces without turning drawings into an independent design source.Plumbing set hierarchy and design-vs-drafting boundaryTrainingConceptDiagram stack plus explicit lesson checklist; document layers are the visual concept while the checklist separates supplied drafting data from professional design decisions.RA 1378; 2024 PRC Master Plumbing IRR; responsible plumbing code/design basis; ISO 128-1.Overall hierarchy only; numbered text is accessible.Verified
Water-System FlowTrace a conceptual water path from source/service through controls and distribution without assuming every project uses the same component order.Water supply system flowSequence diagram with an explicit project-specific caveat; flow continuity is the teaching question, not a universal equipment sequence.Authorized plumbing design basis under RA 1378 and 2024 PRC IRR; project/provider interfaces.Distinct from sanitary/storm systems.Verified
Sanitary-and-Vent RelationshipDistinguish wastewater conveyance from the related vent path, including the building-drain/building-sewer transition.Sanitary drainage vs ventingCompare diagram; the two related but different paths benefit from side-by-side contrast.RA 1378 scope and the 2024 PRC IRR definitions; responsible plumbing code/design basis.Distinct from water and storm sequences; labels do not rely on color.Verified
Stormwater Path From Roof to SiteTrace roof collection to civil/discharge interface.Roof/storm drainage continuitySequence diagram; collection-to-discharge path is the concept.RA 1378 storm-drain scope; PD 1096 building context; authorized civil/plumbing basis.Distinct from sanitary drainage by source and receiving interface.Verified
Plan-to-Riser-to-Isometric TransformationExplain what information each representation contributes and what must remain identical.Multi-view plumbing representationGrid diagram; parallel view roles are easier to compare than animate.ISO 128-1 representation principles; controlled project IDs/sizes.Distinct from system-flow diagrams by focusing on representation.Verified
Interactive Plumbing Vent IsometricTrace fixture, trap, branch, stack, vent, and cleanout relationships in spatial form.Plan/riser/isometric plumbing connectivityExisting PlumbingVentIsometricSim; three-dimensional schematic interaction is stronger than another flat sequence.Existing audited building-utilities simulation; responsible plumbing design/code basis.Adds exact spatial connectivity and is explicitly bounded from sizing/compliance design.Verified
Interactive MEP Overlay and Clash ReviewInspect service routes against architecture, structure, clearances, access, slope, and penetration constraints.Multidisciplinary service coordinationExisting MEPOverlayViewer; coordinated plan/section overlays materially improve clash reasoning.Existing audited building-utilities simulation; current discipline design inputs.Adds spatial clash/clearance review rather than system-flow logic.Verified
Plumbing System and Penetration Coordination ReviewDecide whether system continuity, space, structure, external levels, and design authority are resolved.Plumbing coordination/release workflowShared Flowchart; view-consistency and clash/authorization branches require explicit decisions.RA 1378; 2024 PRC Master Plumbing IRR; PD 1096; lesson coordination rules.Formal decision workflow; shared renderer provides accessible textual equivalent.Verified

Count: 8 qualifying visual learning assets. No decorative or near-duplicate assets are counted.

Reused Interactives — Subject-Profile Compliance

  • PlumbingVentIsometricSim: PASS. Isometric representation is justified because three-dimensional drainage/vent connectivity is the learning target. Source-level review confirms native controls, accessible labels/roles, keyboard-operable interaction, SI-oriented values, and textual state. It is framed as a schematic teaching aid and does not perform or substitute for pipe/vent sizing, drainage-capacity, or code-compliance design.
  • MEPOverlayViewer: PASS. The component uses plan/section overlays for multidisciplinary routing and clearance review, with systems and conflicts identified by labels/state rather than color alone. Source-level review confirms native/keyboard-operable controls, accessibility labels/roles, SI-oriented geometry, and text-visible state. It identifies clashes for responsible-discipline resolution and does not imply that coordination software chooses the engineering solution or that an unreviewed structural penetration is acceptable.