Module 16 Visual Coverage Map
Governing subject visual profile: .agents/visual-profiles/trainings/construction-plan-drafting-and-coordination.md (owned by PR #4527). This profile governs discipline, plan/section/isometric usage, Philippine construction-document context, accessibility, semantic color redundancy, SI-unit expectations, physical plausibility, review boundaries, and cognitive load for this training subject.
Secondary/reference precedent only: .agents/visual-profiles/civil/engineering-drawing-and-plans.md is used only as a precedent for the already-registered engineering-drawing visualizers reused in this module. It does not govern this training subject. Every reused interactive below was rechecked against the canonical training profile.
| Asset | Objective / learning question | Concept | Medium / why | Technical basis | Nonredundancy / accessibility | Status |
|---|---|---|---|---|---|---|
| Plumbing Documentation Stack | Understand how authorized plumbing design information is translated into legends, plans, vertical diagrams, details, schedules, and external interfaces without turning drawings into an independent design source. | Plumbing set hierarchy and design-vs-drafting boundary | TrainingConceptDiagram stack plus explicit lesson checklist; document layers are the visual concept while the checklist separates supplied drafting data from professional design decisions. | RA 1378; 2024 PRC Master Plumbing IRR; responsible plumbing code/design basis; ISO 128-1. | Overall hierarchy only; numbered text is accessible. | Verified |
| Water-System Flow | Trace a conceptual water path from source/service through controls and distribution without assuming every project uses the same component order. | Water supply system flow | Sequence diagram with an explicit project-specific caveat; flow continuity is the teaching question, not a universal equipment sequence. | Authorized plumbing design basis under RA 1378 and 2024 PRC IRR; project/provider interfaces. | Distinct from sanitary/storm systems. | Verified |
| Sanitary-and-Vent Relationship | Distinguish wastewater conveyance from the related vent path, including the building-drain/building-sewer transition. | Sanitary drainage vs venting | Compare diagram; the two related but different paths benefit from side-by-side contrast. | RA 1378 scope and the 2024 PRC IRR definitions; responsible plumbing code/design basis. | Distinct from water and storm sequences; labels do not rely on color. | Verified |
| Stormwater Path From Roof to Site | Trace roof collection to civil/discharge interface. | Roof/storm drainage continuity | Sequence diagram; collection-to-discharge path is the concept. | RA 1378 storm-drain scope; PD 1096 building context; authorized civil/plumbing basis. | Distinct from sanitary drainage by source and receiving interface. | Verified |
| Plan-to-Riser-to-Isometric Transformation | Explain what information each representation contributes and what must remain identical. | Multi-view plumbing representation | Grid diagram; parallel view roles are easier to compare than animate. | ISO 128-1 representation principles; controlled project IDs/sizes. | Distinct from system-flow diagrams by focusing on representation. | Verified |
| Interactive Plumbing Vent Isometric | Trace fixture, trap, branch, stack, vent, and cleanout relationships in spatial form. | Plan/riser/isometric plumbing connectivity | Existing PlumbingVentIsometricSim; three-dimensional schematic interaction is stronger than another flat sequence. | Existing audited building-utilities simulation; responsible plumbing design/code basis. | Adds exact spatial connectivity and is explicitly bounded from sizing/compliance design. | Verified |
| Interactive MEP Overlay and Clash Review | Inspect service routes against architecture, structure, clearances, access, slope, and penetration constraints. | Multidisciplinary service coordination | Existing MEPOverlayViewer; coordinated plan/section overlays materially improve clash reasoning. | Existing audited building-utilities simulation; current discipline design inputs. | Adds spatial clash/clearance review rather than system-flow logic. | Verified |
| Plumbing System and Penetration Coordination Review | Decide whether system continuity, space, structure, external levels, and design authority are resolved. | Plumbing coordination/release workflow | Shared Flowchart; view-consistency and clash/authorization branches require explicit decisions. | RA 1378; 2024 PRC Master Plumbing IRR; PD 1096; lesson coordination rules. | Formal decision workflow; shared renderer provides accessible textual equivalent. | Verified |
Count: 8 qualifying visual learning assets. No decorative or near-duplicate assets are counted.
Reused Interactives — Subject-Profile Compliance
PlumbingVentIsometricSim: PASS. Isometric representation is justified because three-dimensional drainage/vent connectivity is the learning target. Source-level review confirms native controls, accessible labels/roles, keyboard-operable interaction, SI-oriented values, and textual state. It is framed as a schematic teaching aid and does not perform or substitute for pipe/vent sizing, drainage-capacity, or code-compliance design.MEPOverlayViewer: PASS. The component uses plan/section overlays for multidisciplinary routing and clearance review, with systems and conflicts identified by labels/state rather than color alone. Source-level review confirms native/keyboard-operable controls, accessibility labels/roles, SI-oriented geometry, and text-visible state. It identifies clashes for responsible-discipline resolution and does not imply that coordination software chooses the engineering solution or that an unreviewed structural penetration is acceptable.