Module 13 Visual Coverage Map

Governing subject visual profile: .agents/visual-profiles/trainings/construction-plan-drafting-and-coordination.md (owned by PR #4527). This profile governs discipline, plan/section/isometric usage, Philippine construction-document context, accessibility, semantic color redundancy, SI-unit expectations, physical plausibility, review boundaries, and cognitive load for this training subject.

Secondary/reference precedent only: .agents/visual-profiles/civil/engineering-drawing-and-plans.md is used only as a precedent for the already-registered engineering-drawing visualizers reused in this module. It does not govern this training subject. Every reused interactive below was rechecked against the canonical training profile.

AssetObjective / learning questionConceptMedium / whyTechnical basisNonredundancy / accessibilityStatus
Site Information HierarchyIdentify the controlled inputs that must exist before civil/site production. What information is fact, constraint, authorized design, interface, or output?Survey/design information hierarchyTrainingConceptDiagram stack; ordered information ownership is clearer than a pictorial site plan.RA 544 as amended by RA 1582 for civil scope; RA 8560 as amended by RA 9200 for geodetic/survey scope; PD 1096 building/site context; project survey/design controls.Distinct from spatial/elevation relationships. Text labels preserve meaning without color.Verified
Iterative Site-to-Building Coordination LoopReconcile survey base, architectural site layout, grading, drainage, utilities, and building FFL/thresholds. Which interface must be revisited when another changes?Multidisciplinary site/building coordinationTrainingConceptDiagram loop; the real process is iterative rather than a one-way dependency chain.Controlled survey geometry and project datum; architectural/civil/structural/plumbing interfaces.Distinct from the input hierarchy by focusing on repeated cross-discipline reconciliation. Text sequence plus loop label is accessible.Verified
One Datum, Many Elevation UsesDistinguish different physical level types while keeping one controlled datum.Vertical control and discipline levelsGrid diagram; parallel level uses are easier to compare side by side.PD 1096 context; project benchmark/datum practice; drawing-control principles.Distinct from grading/drainage because it isolates datum semantics. Labels do not rely on color.Verified
Grade-to-Drainage RelationshipRecognize coordinated vs defective grading information. Where should water move, and what contradictions signal a problem?Surface grading and drainage continuityCompare diagram; misconception-driven contrast is more effective than another sequence.Responsible civil/hydrologic-hydraulic design; verified datum; receiving/outfall constraints; current project/authority criteria, including DPWH DGCS where adopted.Distinct from datum control by focusing on surface behavior. Both columns are fully labeled.Verified
Interactive Topographic Plan ReaderInterpret contours, spot elevations, terrain form, and survey features before grading.Topographic plan readingExisting TopographicMapSim; interactive technical plan geometry is stronger than another relationship diagram.Existing audited engineering-drawing simulation; verified survey/datum concepts in the lesson.Adds exact spatial/terrain interpretation rather than process logic. Registered viewer provides labeled visual interaction.Verified
Civil/Site Drawing Coordination ReviewDecide whether the package is compatible, needs authorized correction, or must be held.Release/coordination workflowShared Flowchart; branching and hold/response logic materially affect correct application.Content lesson; RA 544 as amended by RA 1582; RA 8560 as amended by RA 9200; PD 1096; project-adopted DPWH/LGU/utility-owner drainage criteria; controlled revisions.Distinct from concept diagrams by formalizing decision logic. Shared renderer provides graph-derived accessible text.Verified

Count: 6 qualifying visual learning assets. No decorative or duplicate assets are counted.

Reused Interactive — Subject-Profile Compliance

  • TopographicMapSim: PASS. The component uses deterministic SVG/technical plan geometry appropriate to survey and site interpretation, with labeled terrain/contour information and SI-oriented values. Source-level review confirms native interactive controls, accessible labels/roles, keyboard-operable controls, and textual state. It is used only to teach topographic-plan reading; the surrounding lesson explicitly identifies its values as a teaching dataset and requires the verified survey/datum and authorized civil design to control actual work. It does not imply authority to alter survey control or select drainage/grading criteria.