Visual Coverage Map — Module 07

Canonical profile audited: .agents/visual-profiles/trainings/construction-plan-drafting-and-coordination.md from PR #4527, profile version 1, reviewed 2026-10-05. The profile is read-only for this PR.

AssetObjectiveLearning questionMedium choice / profile fitTechnical plausibility and authoritySemantic colors / construction-document languageAccessibilityStatus
requirement-to-space-program1,3How does a client statement become a measurable multidisciplinary design basis?Shared Flowchart. Correct for the traceable brief → requirements → program → layout/interface-review loop.Does not prescribe architectural form; professional control remains with the responsible architect while engineering interfaces are screened.Uses brief/program/interface/design-basis vocabulary rather than faux plans.Shared title/description and labeled decision branches; no color dependence.Profile-aligned
Programming Relationship Matrix2How do I classify must-adjoin, near, separate, and zone-transition relationships before drawing a plan?TrainingConceptDiagram — grid. Deliberately replaces a process flow with a relational matrix, matching the profile's grid/comparison mode.Relationship classes are programming instructions, not universal adjacency rules; public/controlled-private/service transitions are explicitly project-specific.Neutral cards avoid a misleading “three-color zoning plan.” Relationship type and zone names are textual, so semantics do not depend on color.Informative title/description/details; all four relationship classes are explicit text.Profile-aligned
Functional Zoning and Circulation Relationship Map2How do public, controlled/private, service, vertical-circulation, wet/service-core, and principal-path systems relate?TrainingConceptDiagram — grid. Non-process, deterministic relationship map; intentionally not a fake architectural floor plan.Shows programming relationships and interface checks without prescribing room geometry or a universal arrangement.Public/private/service/vertical/wet-core/path identities are text-labeled. Neutral construction-document style keeps architecture subordinate to the programming question.Title/description/details explain how to read the map; every zone/path is named and no color-only meaning is used.Profile-aligned
preliminary-design-package3,4,5What must a preliminary issue communicate to consultants?Shared Flowchart. Correct because several controlled information streams converge into a package-completeness decision.Includes plans/sections/levels, program, assumptions, interfaces, constraints, and questions without implying final discipline design.Controlled issue/package/question terminology matches drawing/document coordination practice.Stream labels and decision branches are explicit.Profile-aligned
consultant-issue-sequence5How do consultant markups become controlled design decisions?Shared Flowchart. Correct for response, clarification, incorporation, reissue, and release loop.Preserves professional decision ownership and does not imply that coordination comments transfer design responsibility.Uses markup/response/decision/reissue/controlled basis language; no decorative office/CAD imagery.Labeled loop and branches provide full nonvisual meaning.Profile-aligned

Profile-level audit

  • Primary visual modes: two deterministic relational grids plus three true workflows. This corrects the prior all-flowchart imbalance and better matches architectural programming's spatial/relational learning target.
  • Technical plausibility: relationship diagrams teach categories and interfaces, not a universal floor plan. They do not invent dimensions, area ratios, accessibility geometry, or code values.
  • Semantic discipline/zone colors: public, controlled/private, service, wet/service-core, vertical circulation, and principal paths are encoded by text/position rather than color. No three-color zoning convention is presented as universal.
  • Construction-document visual language: controlled brief, program, issue, assumptions, consultant markups, and coordination-basis terminology is used; no fake architectural sheet or floor plan is presented.
  • Accessibility: all five assets have informative titles/descriptions; the two non-process diagrams include textual reading guidance, and shared workflows have labeled branches.
  • Cognitive load: each diagram addresses one programming relationship question; the relationship maps remain schematic and do not overload room geometry.
  • Rendered-geometry limitation: source-level/profile alignment was audited; no browser rendering or production geometry inspection was performed.