Visual Coverage Map — Module 06

Canonical profile audited: .agents/visual-profiles/trainings/construction-plan-drafting-and-coordination.md from PR #4527, profile version 1, reviewed 2026-10-05. The profile is read-only for this PR.

AssetObjectiveLearning questionMedium choice / profile fitTechnical plausibility and authoritySemantic colors / construction-document languageAccessibilityStatus
permit-lifecycle1,4How does a project move from pre-application to occupancy?Shared Flowchart. Correct lifecycle medium because review, corrections, approval, construction change, closeout, and occupancy form a branched loop.Reflects P.D. 1096 permit/change/closeout duties, BFP permit/occupancy gates, and current local-process variability.Uses document states, approved-change, review, permit, completion, and occupancy language. No fake permit stamp or government form is shown.Labeled nodes/branches carry state meaning independently of color.Profile-aligned
multidisciplinary-submission-map2,5What information streams form the permit package and who owns them?Shared Flowchart. Converging document streams plus completeness decision justify workflow representation.Keeps architectural, civil/structural, MEPF, fire, admin/site, calculations, and supporting records separate while preserving professional responsibility.Discipline names are explicit text labels; no assumed color legend. Package/issue-control vocabulary matches construction-document practice.Every discipline stream is named; no reliance on colored lanes.Profile-aligned
obo-review-loop3What happens after filing and before permit issuance?Shared Flowchart. Appropriate for documentary screening → OBO/BFP/referral evaluation → correction/resubmission → assessment/issuance.FSEC/technical-review logic is consistent with the BFP RIRR and current permit framework; local routing remains qualified.Approval/deficiency/resubmission labels follow controlled-review language; no invented reviewer stamps.Decision branches are text-labeled and status accents are redundant.Profile-aligned
comments-resubmission3,5How should a team close a permit comment without causing new conflicts?Shared Flowchart. Correct for issue ownership, impact review, correction, cross-check, and resubmission.Prevents one-sheet fixes and preserves responsible-professional routing.Uses issue/comment/revise/cross-check/resubmit terminology consistent with coordination registers and revision control.Explicit issue states and branch labels; concise node wording.Profile-aligned
permit-to-occupancy1,4How do approved plans, construction changes, completion records, FSIC, and occupancy relate?Shared Flowchart. Correct document-lifecycle medium.Reflects Building Official approval of plan changes, Section 308 completion records, BFP FSIC prerequisite, and OBO Certificate of Occupancy sequence.Controlled-document status language; no fake occupancy certificate, signature, or seal.Text states communicate sequence independently of semantic accents.Profile-aligned

Profile-level audit

  • Primary visual modes: five true workflows; this is appropriate for permit processing because the learning target is process/control rather than geometric drafting.
  • Technical plausibility: permit, FSEC/FSIC, change-approval, completion, and occupancy relationships are supported by cited Philippine authorities; local sequencing is never universalized.
  • Semantic discipline colors: no asset depends on color to distinguish OBO, BFP, architecture, engineering, or status; labels and branch text carry the distinction.
  • Construction-document language: uses controlled package, review comment, revision, approval, resubmission, supersession/current issue, closeout, and occupancy terminology.
  • Accessibility: shared renderer provides titles/descriptions and derived process text; every decision has labeled branches.
  • Cognitive load: each flow isolates one permit/review question; the lifecycle map is the only broad overview.
  • Rendered-geometry limitation: source-level/profile alignment was audited; no browser rendering or production geometry inspection was performed.