FW07 — Closed Traverse Survey Using a Surveyor's Compass

Learning Objectives

  • Reconnoiter, mark, and observe a closed compass traverse.
  • Measure magnetic direction and side length for every traverse course.
  • Record fore and back bearings using consistent station IDs.
  • Detect evidence of local attraction from fore/back-bearing disagreement.
  • Apply documented station corrections when local attraction can be resolved.
  • Compute preliminary latitudes, departures, linear error of closure, and relative precision from corrected directions.

Fore Bearing

The direction of a traverse line observed from its starting station toward its ending station.

Back Bearing

The direction of the same line observed from the opposite end. In the absence of local attraction and observational error, fore and back directions differ by exactly 180° when expressed as azimuths.

Local Attraction

A local magnetic disturbance that deflects the compass needle from the magnetic meridian, commonly caused by nearby steel, vehicles, electrical equipment, reinforced structures, or other magnetic sources.

Compass Traverse Principle

A closed traverse provides a geometric loop of connected stations. The compass supplies magnetic direction while taping or another assigned method supplies side length. Direction observations must be checked before coordinate computations are trusted because local attraction can affect all directions observed at a station.

Reconnaissance and Station Selection

Station Requirements

Field Procedure

Compass Traverse Observation

  1. Reconnoiter the site and mark stations A, B, C, D, or the assigned station sequence.
  2. At the first station, center and level the compass as required by the instrument.
  3. Sight the next station and record the fore direction exactly as read.
  4. Measure the side length and record the method and units.
  5. Move to the next station and observe the back direction of the line just measured.
  6. Observe the fore direction to the next station.
  7. Continue around the traverse until the final course returns to the starting station.
  8. Before leaving, compare every fore/back pair and investigate large deviations from the expected 180° relationship.
  9. Record nearby magnetic objects or site conditions that may explain local attraction.

Bearing Convention

State whether the field book uses quadrantal bearings or whole-circle azimuths. Do not mix conventions within one table. Convert only in a separate reduction column when required.

Latitude of a Traverse Course

North-south component from course length and azimuth.

Lat=Lcos⁡A\text{Lat}=L\cos A

Variables

SymbolDescriptionUnit
LLcourse length-
AAazimuth measured clockwise from north-

Departure of a Traverse Course

East-west component from course length and azimuth.

Dep=Lsin⁡A\text{Dep}=L\sin A

Variables

SymbolDescriptionUnit
LLcourse length-
AAazimuth measured clockwise from north-

Linear Error of Closure

Magnitude of the preliminary traverse-coordinate misclosure.

LEC=(∑Lat)2+(∑Dep)2LEC=\sqrt{(\sum \text{Lat})^2+(\sum \text{Dep})^2}

Relative Precision

Ratio of total traverse length to linear error of closure.

RP=∑LLECRP=\frac{\sum L}{LEC}

Magnetic North Is Not Fixed

Compass directions are magnetic observations. They are not automatically true, grid, or cadastral bearings. Magnetic declination and local attraction must be distinguished, and the reference meridian used in the report must be stated.

Before Leaving the Site

Submission Timing

Fieldwork Data is due within the scheduled 3-hour class period. The Full Fieldwork Report is due on the next class meeting. FW00 remains authoritative for field safety, raw-data integrity, and submission requirements.

FW07 — Required Data Tabulation

Use this structure as the minimum field or research data table. Add columns when the activity requires more detail.

LineDistance (m)Fore bearingBack bearingFB ↔ BB checkCorrected bearingRemarks / local attraction
ABRecordRecordRecordComputeCompute if neededStation condition
BCRecordRecordRecordComputeCompute if neededStation condition
CDRecordRecordRecordComputeCompute if neededStation condition

Continue for the full traverse. If local attraction is diagnosed, preserve observed bearings and show corrected bearings in separate columns.

FW07 — Grading Rubric

Award points according to the evidence shown for each criterion.

Total: 25 pts
CriterionFull-credit evidencePoints
Reconnaissance, compass use, and safetyTraverse stations are suitable; compass is handled correctly; magnetic interference and site hazards are actively considered.5
Distance and bearing observationsAll course lengths, fore bearings, back bearings, station IDs, and field notes are complete.6
Local-attraction diagnosis and correctionsFB/BB relationships are checked, affected stations are correctly identified, and corrections are justified without overwriting raw data.6
Traverse checks and plottingCorrected directions are coherent, angular/graphical checks are completed, and the traverse sketch/plot is consistent.4
Report quality and traceabilityObserved versus corrected values, assumptions, magnetic conditions, field sketch, and conclusions are clearly documented.4
Total25 / 25

Scoring guide: full credit for complete, technically correct, traceable evidence; reduce proportionally for minor errors, incomplete work, or weak documentation.

Key Takeaways
  • Fore/back checks are essential for recognizing local attraction.
  • Corrected bearings belong in a separate reduction record; raw compass readings remain unchanged.
  • A closed traverse permits quantitative closure checks after direction and distance reduction.
  • Compass work provides useful field-control practice but does not replace higher-precision control methods when those are required.