Module 4: Boundary Retracement, Computation, and Monumentation - Worked Examples

These cases focus on evidence reconciliation. The aim is to explain why a corner is accepted, investigated, or left unresolved—not merely to generate a coordinate.

Old Monument Differs from a Computed Coordinate

A clearly identifiable old concrete monument is 0.25 m from a coordinate computed from a current office plot. The adjacent record distances measured from the monument are close to the approved plan.

Step-by-Step Solution

0 of 3 Steps Completed
1

Missing Rear Corner with Two Recovered Adjacent Corners

Two adjacent parcel corners are recovered and consistent with the approved record, but the intervening rear corner monument is not found.

Step-by-Step Solution

0 of 3 Steps Completed
1

Suspected Disturbed Iron Pin

An iron pin is found near the expected corner but is loose, leaning, and located in recently excavated ground.

Step-by-Step Solution

0 of 3 Steps Completed
1

Coordinate Forward Check from Azimuth and Distance

A checked course begins at P1 with E1=5000.000 mE_1=5000.000\text{ m} and N1=10000.000 mN_1=10000.000\text{ m}. Its horizontal distance is D=100.000 mD=100.000\text{ m} and its azimuth is α=35∘00′00′′\alpha=35^\circ00'00'', measured clockwise from north. Compute P2.

Coordinate Forward Check

Step-by-Step Solution

0 of 3 Steps Completed
1

Inverse Distance Check Between Two Corners

Two observed corner coordinates are E1=5000.000E_1=5000.000 m, N1=10000.000N_1=10000.000 m and E2=5030.000E_2=5030.000 m, N2=10040.000N_2=10040.000 m. Compute their inverse distance.

Step-by-Step Solution

0 of 3 Steps Completed
1

Coordinate Residual Magnitude

A recovered monument differs from a comparison coordinate by ΔE=+0.060\Delta E=+0.060 m and ΔN=−0.080\Delta N=-0.080 m. Compute the residual magnitude.

Step-by-Step Solution

0 of 3 Steps Completed
1

Coordinate Area Check by the Shoelace Method

A four-corner training parcel has local plan coordinates in metres, ordered around the boundary: A (0.000,0.000)(0.000,0.000), B (40.000,0.000)(40.000,0.000), C (40.000,30.000)(40.000,30.000), and D (0.000,30.000)(0.000,30.000), where each pair is (E,N)(E,N). Compute the coordinate area.

Coordinate Area Check

Step-by-Step Solution

0 of 4 Steps Completed
1

Linear Misclosure and Relative Closure Check

A synthetic four-course traverse has total measured length ∑L=250.000 m\sum L=250.000\text{ m}, northing misclosure fN=+0.012 mf_N=+0.012\text{ m}, and easting misclosure fE=−0.016 mf_E=-0.016\text{ m}. Compute the linear misclosure and express the relative closure ratio.

Step-by-Step Solution

0 of 3 Steps Completed
1

Systematic Shift Across Four Recovered Corners

Four identifiable parcel monuments all plot approximately 1.20 m east of supplied spreadsheet coordinates, while their measured inter-corner distances and bearings agree closely with the approved plan.

Step-by-Step Solution

0 of 3 Steps Completed
1

Traverse Adjustment Cannot Repair a Wrong Record Call

A closed field traverse has acceptable internal observation quality, but one approved-record distance differs from all field and adjoining evidence by 8.0 m.

Step-by-Step Solution

0 of 3 Steps Completed
1

Compass Adjustment - Example 1

A four-course training traverse has a total length of 140.000 m. Before adjustment, the coordinate sums are fN=+0.028f_N=+0.028 m and fE=−0.021f_E=-0.021 m. Course 1 is 40.000 m long. Assume the observations have passed blunder checks, the closure meets the applicable project or agency acceptance criterion, and the Compass/Bowditch model is appropriate for this example.

Step-by-Step Solution

0 of 5 Steps Completed
1

Compass Adjustment - Example 2

A four-course training traverse has course lengths 40.00040.000, 30.00030.000, 40.00040.000, and 30.000 m30.000\text{ m}, for ∑L=140.000 m\sum L=140.000\text{ m}. After blunder checks, its unadjusted coordinate sums are fN=+0.028 mf_N=+0.028\text{ m} and fE=−0.021 mf_E=-0.021\text{ m}. Assume the closure meets the applicable project or agency acceptance criterion and the Compass/Bowditch model is appropriate; compute every course correction.

Step-by-Step Solution

0 of 5 Steps Completed
1

Preparing a Reproducible Corner Record

A corner is accepted after the monument, adjacent record lines, and field observations reconcile.

Step-by-Step Solution

0 of 3 Steps Completed