Module 3: Control, Reconnaissance, and Field Survey - Worked Examples
These field scenarios practice method selection and independent checks before boundary analysis begins.
Supplied Coordinates with an Unknown Reference System
A client spreadsheet lists four corner coordinates but does not identify datum, projection, zone, control source, or how the coordinates were produced.
Step-by-Step Solution
0 of 3 Steps CompletedIndependent GNSS Check Points With a Project-Specific Limit
Before setting parcel corners, a crew checks its GNSS setup against two independent known points in the same declared reference frame, projection, and metre coordinate system. For this fictional training project only, the written specification requires each horizontal residual to be at most m. This value is an illustrative project requirement, not a universal DENR or NAMRIA tolerance.
| Check point | Reference (m) | First observed (m) |
|---|---|---|
| B | ||
| C |
Step-by-Step Solution
0 of 4 Steps CompletedGNSS Corner Under Dense Canopy
An expected rear corner lies under dense tree canopy beside a concrete wall. The rover repeatedly loses initialization and produces inconsistent positions.
Step-by-Step Solution
0 of 3 Steps CompletedRepeated RTK Occupation Check
A monument is observed twice after independent rover reinitialization. The second position differs from the first by 0.012 m east and 0.016 m north.
Step-by-Step Solution
0 of 3 Steps CompletedTotal-Station Backsight Orientation Check
A crew sets on verified control point A and backsights verified point B before observing property evidence.
Step-by-Step Solution
0 of 3 Steps CompletedClosing a Property Traverse
A site prevents direct observation of two rear corners from the GNSS control. The crew runs a total-station traverse through the parcel.
Step-by-Step Solution
0 of 3 Steps CompletedDocumenting a Found Concrete Monument
A concrete monument is found near the expected front corner and appears undisturbed.
Step-by-Step Solution
0 of 3 Steps CompletedUnexpected 0.60 m Field Discrepancy Before Demobilization
A found monument is about 0.60 m from the office-predicted location while the rest of the parcel appears consistent.