Supplied Coordinates with an Unknown Reference System

A client spreadsheet lists four corner coordinates but does not identify datum, projection, zone, control source, or how the coordinates were produced.

Step-by-Step Solution

0 of 3 Steps Completed
1

Independent GNSS Check Points With a Project-Specific Limit

Before setting parcel corners, a crew checks its GNSS setup against two independent known points in the same declared reference frame, projection, and metre coordinate system. For this fictional training project only, the written specification requires each horizontal residual to be at most 0.0300.030 m. This value is an illustrative project requirement, not a universal DENR or NAMRIA tolerance.

Check pointReference (E,N)(E,N) (m)First observed (E,N)(E,N) (m)
B(1050.000, 2000.000)(1050.000,\ 2000.000)(1050.018, 1999.976)(1050.018,\ 1999.976)
C(1000.000, 2050.000)(1000.000,\ 2050.000)(999.972, 2050.024)(999.972,\ 2050.024)

Step-by-Step Solution

0 of 4 Steps Completed
1

GNSS Corner Under Dense Canopy

An expected rear corner lies under dense tree canopy beside a concrete wall. The rover repeatedly loses initialization and produces inconsistent positions.

Step-by-Step Solution

0 of 3 Steps Completed
1

Repeated RTK Occupation Check

A monument is observed twice after independent rover reinitialization. The second position differs from the first by 0.012 m east and 0.016 m north.

Step-by-Step Solution

0 of 3 Steps Completed
1

Total-Station Backsight Orientation Check

A crew sets on verified control point A and backsights verified point B before observing property evidence.

Step-by-Step Solution

0 of 3 Steps Completed
1

Closing a Property Traverse

A site prevents direct observation of two rear corners from the GNSS control. The crew runs a total-station traverse through the parcel.

Step-by-Step Solution

0 of 3 Steps Completed
1

Documenting a Found Concrete Monument

A concrete monument is found near the expected front corner and appears undisturbed.

Step-by-Step Solution

0 of 3 Steps Completed
1

Unexpected 0.60 m Field Discrepancy Before Demobilization

A found monument is about 0.60 m from the office-predicted location while the rest of the parcel appears consistent.

Step-by-Step Solution

0 of 3 Steps Completed
1