FW03 — Differential Leveling and Elevation Determination
I — Project Details
II — Survey Team and Equipment Used
A — Survey Team
B — Equipment Used
III — Project Sketch and Photo Documentation
A — Project Sketch
FW03 — Differential Leveling Route
B — Google Maps Location Points
The benchmark elevation is the engineering control. The Google Maps pin is contextual and must not be treated as the elevation source.
C — Photo Documentation — Dedicated Page
Reserve one complete report page for the embedded original images represented by this register.
IV — Observations and Data
A — Raw Level Notes
B — Computed and Adjusted Elevations
C — Quality-Control Data
V — Computations and Assumptions
Arithmetic check:
Assigned classroom tolerance:
Because , the loop is accepted for adjustment.
Correction proportional to cumulative distance over total length :
For TP-02:
Assumptions and conventions:
- BM-01 elevation is fixed at 100.000 m.
- The assigned tolerance is mm with in kilometres.
- Misclosure is distributed in proportion to cumulative route length.
- Raw elevations remain unchanged and are shown separately from adjusted elevations.
- Adjusted elevations are reported to 0.0001 m in the computation table.
VI — Remarks and Conclusions
A — Remarks
- The turning-point rod remained on the same physical point while the instrument moved.
- Parallax and level condition were checked at each setup.
- Unequal sight lengths, rod plumbing, settlement of a turning point, and reading/booking errors are probable error sources.
- No raw BS or FS reading was overwritten during adjustment.
B — Conclusion
The level loop returned to BM-01 with a raw misclosure of +6 mm, within the assigned ±8.314 mm tolerance. Proportional adjustment closes the route exactly on the known benchmark, so the adjusted elevations in Section IV are adopted for subsequent work.
Example filename: `G#1-P#3-Differential Leveling.pdf`